Structure and cascade
The topology of the Argentine energy system is public. The gas and power networks can be rebuilt node by node from open data, and that data is what this map uses.
Toggle the layers at top right. Gas: nodes and segments from the transmission-network snapshot. Power: high-voltage lines ≥220 kV colored by voltage level, and generation sized by installed capacity. Sources: the gas snapshot and the Energy Secretariat's datasets.
Two coupled networks
Gas feeds thermal generation. Generation feeds the power grid, and the grid feeds gas compressor stations. The map shows 76 pipeline segments, 221 backbone lines (133 at 500 kV), and 52 plants sized by capacity, from Yacyretá and Atucha to the thermal plants around Buenos Aires.
Because of that coupling, a failure in one link can force another offline.
What depends on each node
A node's criticality is measured by what depends on it. The gas graph is walked in the direction of transport, and each point gets the number of nodes that would be cut off if it went out of service.
Orange, nodes above half the maximum; gold, the middle; green, low impact. Source: reachability over the directed graph of the gas transmission network.
The Neuquén basin leads. Loma La Lata has 29 nodes downstream, San Sebastián 28, and Magallanes 26; the last two carry southern gas toward the center of the country. Those three points concentrate the network's connectivity.
Why flow is not used
The snapshot carries a flow figure per segment, with known errors: some segments exceed 100% of capacity. That is why criticality is measured by connectivity. Measuring it by flow would need data this source does not have.
Limits
- Coordinates for refineries, LNG terminals, and upstream hubs are approximate and already public. There is no asset inventory.
- The gas snapshot is from September 30, 2025, and leaves out the reversal and the ex-GPNK expansion.
- A node's rank does not predict the outage it would cause. The model follows the source → target direction and leaves out storage, linepack, and imports (LNG, Bolivia).
- The cascade covers gas only. The power grid is meshed; its weight is shown as installed capacity on the map above.
What has already happened on this network is in incidents.